• Start of work: 2021 to date (low-rate oil wells)
• Results: 34 oil wells processed. Water cut reduction from 96% to 30% on average. Increased individual well oil flow from 60% to 100% on average
• Start of work: 2023 to date (offshore oil platform)
• Results: : 9 oil wells processed. Increased individual well oil flow from 30% to 60% on average.
• Start of work: 2013 to date (low-rate oil wells)
• Results: Over 160 oil and gas wells have been processed. A set of works was also carried out to level the injectivity profile through injection wells.
Water cut reduction from 94% to 45% on average. Increased individual well oil flow from 60% to 100% on average.
• Start of work: 2019 to date (low-rate oil wells)
• Results: Over 500 oil and gas wells have been processed. Efficiency: 88%. Reduction in water cut from 90% to 50% on average. More than 100,000 tonnes (750,000 barrel) of new oil were obtained.